Fall Line Trail – Longdale Phase
Project Status: Underway - Design
Estimated Cost: $30.5 million
Start Date: 2025
Estimated End Date: 2027
Magisterial District: Fairfield
The County of Henrico will be constructing approximately 3.2 miles of a 12-foot-wide asphalt multi-use trail from the intersection of Parham Road and Cleveland Street to the new Woodman Road Extension. This work will be a part of The Fall Line Trail, a 43-mile north-south paved trail that will connect Ashland to Petersburg. Additional design features for the Longdale Phase may include but are not limited to:
|
Estimated Schedule: |
|
Progress to Date
- A public hearing was held on September 14, 2022, at the Longdale Elementary School between 5:00 and 6:30 pm. A virtual presentation is posted below.
- Please see the additional project and display links for more information.