Greenwood Road Bridge Repair

Project Status: Underway - Design

Estimated Cost: TBD
Start Date: TBD
Estimated End Date: TBD

Magisterial District:   Brookland  


The County of Henrico will be conducting bridge rehabilitation activities on the Greenwood Road Bridge crossing over CSX railroad tracks located between Old Washington Highway and the Henrico-Hanover County line.  The following improvements will be constructed, including: 

  • Repair and rehabilitation of the bridge substructure. 
  • Repair and rehabilitation of the bridge superstructure, including bearing replacement. 
  • Guardrail System improvements. 
  • Concrete surface penetrate sealing of concrete elements  
  • Protective painting of superstructure elements. 

Estimated Schedule:

  • Design is underway.
  • Right-of-way acquisition is complete.  
  • Utility relocation is complete. 
  • Advertisement for Construction is TBD.
  • Construction coordination with CSX is TBD. 
  • Project completion is TBD. 

Contact Us

Robert Whitaker III
(804) 727-8253
[email protected]


Public Works

Henrico Department of Public Works
4305 E. Parham Rd.
Henrico, VA 23228

Phone
(804) 501-4393

[email protected]

Mailing Address
P. O. Box 90775
Henrico, VA 23273-0775

Twitter Facebook

 
Google Translate Icon

Translate