Greenwood Glen & Magnolia Ridge Connector Trail

Project Status: Underway - Design

Estimated Cost: $1.2 Million
Start Date: 2025
Estimated End Date: 2025

Magisterial District:   Fairfield  


Project Description:

The County is building a shared use path from the cul-de-sac at the end of Greenwood Glen Drive to Correnty Drive. 

 

Estimated Schedule: 

  • Design began in 2023 
  • Right-of-way acquisition is anticipated to begin 3rd quarter 2024 
  • Utility relocation is not anticipated with this project. 
  • Advertisement for construction anticipated for 2025 
  • Construction to begin in 2025 