Garden City Pedestrian Bridge

Project Status: Preliminary

Estimated Cost: TBD
Start Date: 2026
Estimated End Date: 2028

Magisterial District:   Fairfield  


The County of Henrico will be re-constructing the Scott Road bridge across Interstate 95 to join the Garden City Connector Trail. The bridge will be rehabilitated, reconstructed, or replaced for pedestrian and bike use only. Bridge details are TBD.  

 

 

Estimated Schedule: 

  • Design is preliminary 
  • Right-of-way acquisition is anticipated to begin in 2025 
  • Utility relocation is anticipated to begin in 2025 
  • Advertisement for construction is anticipated to begin in 2026 
  • Construction is anticipated to begin in 2026 