Ridge Road Sidewalk

Project Status: Underway - Design

Estimated Cost: $193,000
Start Date: On Hold
Estimated End Date: On Hold

Magisterial District:   Tuckahoe  


The County of Henrico will be constructing approximately 0.36 miles of 5-foot wide sidewalk with a 2-foot wide grass strip along the southwest side of Ridge Road between Old Providence Circle and North Ridge Road. Along with approximately 260 linear feet of new curb and gutter and road widening between Ziontown Road and the adjacent business parcel.

Estimated Schedule

  • Design is anticipated to begin: Under design.
  • Right-of-way acquisition anticipated to begin: On Hold
  • Utility re-locations are anticipated to begin: On Hold
  • Advertisement for construction is anticipated: On Hold
  • Construction is anticipated to begin: On Hold
  • Project completion is anticipated: On Hold

Progress to Date

  • 70% plan currently under review.

Contact Us

Steve Bandura
(804) 501-5985
ban03@henrico.us


Public Works

Henrico Department of Public Works
4305 E. Parham Rd.
Henrico, VA 23228

Phone
(804) 501-4393

DPW@henrico.us

Mailing Address
P. O. Box 90775
Henrico, VA 23273-0775

 
Google Translate Icon

Translate