The County of Henrico will be installing sidewalk along Ridgefield Parkway between Lauderdale Drive and Gayton Road. This section of sidewalk is Phase 3 of the overall Ridgefield Parkway Sidewalk project and is connecting to existing sidewalk at the Ridgefield Parkway and Gayton Road intersection. Approximately 1,700 feet of sidewalk will be constructed. 

Estimated Schedule: (Month Year) 

  • Design is anticipated to begin 12/2022 
  • Right-of-way acquisition is anticipated to begin 08/2023  
  • Utility relocation begins 12/2023 
  • Advertisement for construction is anticipated 12/2024 
  • Construction is anticipated to begin 03/2025  

Contact Us

Ryan Levering
804-501-4244
lev004@henrico.us


Public Works

Henrico Department of Public Works
4305 E. Parham Rd.
Henrico, VA 23228

Phone
(804) 501-4393

DPW@henrico.us

Mailing Address
P. O. Box 90775
Henrico, VA 23273-0775

 
Google Translate Icon

Translate