Pump Road Sidewalk Project

Project Status: Underway - Design

Estimated Cost: $1.6 Million total
Start Date: Fall 2019
Estimated End Date: Summer 2020

Magisterial District:   Three Chopt  


The County of Henrico will be constructing pedestrian access along the east side of Pump Road from Sandy Bluff Drive to Hazel Tree Drive.  The project will include road widening, curb and gutter and additional storm sewer.

Estimated Schedule

  • Design is underway
  • Right-of-way acquisition is anticipated to begin Spring 2019
  • Utility relocation is anticipated to begin Summer 2019
  • Advertisement for Construction is anticipated Fall 2019
  • Construction is anticipated to begin in Fall 2019
  • Project completion is anticipated in Summer 2020