Nuckols Road Turn Lane, Phase II
Project Status: Underway - Construction
Estimated Cost: $ 930,000 total
Start Date: October 2022
Estimated End Date: February 2023
Magisterial District: Three Chopt
The County of Henrico will be constructing approximately 700 linear feet of an extended right turn lane. A 5-foot wide sidewalk with a 2-foot grass utility strip will be built along with ADA compliant ramps along the westside of Nuckols Road between Sadler Road and Cox Road.
Estimated Schedule
- Design completed.
- Right-of-way completed.
- Utility relocations completed.
- Advertisement for construction is anticipated: January 2022
- Construction is anticipated to start: October 2022
- Project completion is anticipated: February 2023