N Laburnum Avenue Pedestrian and Transit Improvements

Project Status: Underway - Design

Estimated Cost: $3.4 million
Start Date: 2026
Estimated End Date: 2027

Magisterial District:   Fairfield  


The County of Henrico will be constructing the following improvements along the eastern side of N Laburnum Avenue between Harvie Elementary School and previous Henrico County Fairfield Library: 

  • Approximately 2,250 linear feet of 5’ wide sidewalk, curb ramps and crosswalks.  
  • Approximately 900 linear feet of new curb and gutter and storm drainage system. 
  • Lane widening of approximately 9’ to match adjacent pavement widths in some locations, a wooden bridge to avoid extending two box culverts.  
  • Improvements to two bus stops that could include shelters and other amenities.  
  • Ten dedicated park and ride spaces will be identified in the parking lot of the Eastern Henrico Recreation Center. 

Estimated Schedule: (Month Year) 

  • Design is underway. 
  • Right-of-way acquisition is anticipated to begin in 2025. 
  • Utility relocation is anticipated to begin in 2025. 
  • Advertisement for construction is anticipated for 2026. 
  • Construction is anticipated to begin in 2026. 
  • Project completion is anticipated for 2027. 

Contact Us

Kevin Newcomb
(804) 501-5532
[email protected]


Public Works

Henrico Department of Public Works
4305 E. Parham Rd.
Henrico, VA 23228

Phone
(804) 501-4393

[email protected]

Mailing Address
P. O. Box 90775
Henrico, VA 23273-0775

Twitter Facebook

 
Google Translate Icon

Translate