Dumbarton Road Safety and Mobility Improvements

Project Status: Underway - Design

Estimated Cost: $1.5 million
Start Date: 4th Quarter, 2024
Estimated End Date: 4th Quarter, 2024

Magisterial District:   Fairfield  


The County of Henrico will be constructing accommodations to increase pedestrian access and connectivity. The following improvements will be constructed, including: 

  • Re-paving and re-striping Dumbarton Road from Staples Mill Road to Brook Road to implement a “road diet” and encourage a more community-focused, complete streets environment. 
  •  Upgrade traffic signals at Byrdhill Road, Impala Road, and Hermitage Road/Westlake Avenue to install new signal cabinets, poles, signal heads, bicycle accommodations, and pedestrian push buttons. 
  • Evaluate future locations for pedestrian crosswalks along Dumbarton Road between Byrdhill Road and Lakeside Avenue.
 

Estimated Schedule: (Month Year) 

  • Design is underway. 
  • Right-of-way acquisition is not anticipated.
  • Utility relocations are not anticipated.
  • Advertisement for construction is anticipated 3rd Quarter, 2024. 
  • Construction is anticipated 4th Quarter, 2024. 

Progress to Date

  • Virtual public information meeting and online comment period from February 21 through March 13, 2022. Below is a link to the public feedback summary.

The preferred concept is planned for implementation during spring 2024 coinciding with a full repaving of Dumbarton Road. A buffered bike lane will be striped on both sides of the roadway along with a right/left center turn lane. A depiction of this layout is linked below.

PIM_Display_DumbartonReconfigurartion_LakesideSafety_20130112

 

 


Contact Us

Ryan Levering
(804) 501-4244
[email protected]


Public Works

Henrico Department of Public Works
4305 E. Parham Rd.
Henrico, VA 23228

Phone
(804) 501-4393

[email protected]

Mailing Address
P. O. Box 90775
Henrico, VA 23273-0775

Twitter Facebook

 
Google Translate Icon

Translate