Plans of Development, Site Plan and Subdivisions FAQs

What is a Plan of Development (POD)?

When is a POD necessary?

When is a Site Plan necessary?

What is a subdivision?

When is subdivision approval necessary?

What do I need to apply for POD or Site Plan approval?

What procedure is required to obtain POD or Site Plan approval?

What process is required to obtain subdivision plat approval?

 

 

 

What is a Plan of Development (POD)?

A Plan of Development (POD) and a Site Plan are detailed engineering drawings of a property, which depict proposed building layout, water and sewer lines, roads, drainage, landscaping, lighting, and other necessary improvements to develop a property for an intended use. The proposed use of the property must be permitted by the current zoning classification. Review of a POD or Site Plan is a multi-stage process during which the applicant submits a plan for coordinated review by county review agencies.  The original stage of the project is submitted for approval of the overall site development layout and buildings by the Director of Planning.  Subsequent stages of the project, including construction plan approval and building permit approval for the structures, are reviewed and approved administratively by staff.

 

When is a POD necessary?

The Plan of Development review process was implemented to ensure the layout and general design of proposed development complies with all applicable standards in the County Code prior to the development or use of the property. The procedure generally provides for such review of development above 50 dwelling units or 65,000 square feet of gross floor area or principal use area for an overall project; development below those thresholds is approved through Site Plan review. The review includes final construction plans to ensure that development on the site complies with the County regulations prior to the issuance of a building permit; and includes provisions to ensure that required on-site improvements are installed prior to a  certificate of occupancy.

A POD is generally required for :

  • Residential development in the R-5A, R-5, R-6, RTH, Mixed Use, and Planned Development districts consisting of 50 or more dwelling units;
  • Nonresidential development having a gross floor area of 65,000 square feet or more; and
  • Development for which plan of development review is required by Article 4: Use Regulations

In determining the number of dwelling units or the gross floor area of a development, all phases or sections of a development having more than one phase or section will be counted.

 

When is a Site Plan Necessary?

The Site Plan Review process provides for such review in situations where proposed development does not require Plan of Development review because it contains fewer than 50 dwelling units or less than 65,000 square feet of gross floor area or principal use area of nonresidential development.  The layout and general design of proposed development shown on a Site Plan are reviewed by County review agencies to ensure it complies with County regulations. Once this initial review is complete, site plans are approved by the Director of Planning.   The subsequent review includes final construction plans to ensure that development on the site complies with all County regulations prior to the issuance of a building permit; and includes provisions to ensure that required on-site improvements are installed prior to a certificate of occupancy.

 

What is a subdivision?

Subdivision is the process of creating one or more new lots from an existing parcel. The term subdivision is most often associated with division of land for residential dwellings, including single family and townhouse developments. Subdivision is typically submitted through the Preliminary Plat or Final Plat process. Division of land for commercial, business, industrial, or office development for which a POD is required may be eligible for division through the Minor Subdivision process. Consolidation of or alteration to individual lots or parcels of land will also require Planning Department approval, typically under the Minor Subdivision process.

 

When is subdivision approval necessary?

Subdivision of land must be reviewed by the Planning Department and a subdivision plat must be recorded whenever a parcel is divided, or for the creation or extension of a public road. This process includes a Preliminary Plat review and/or a Final Plat review. A Minor Subdivision must be reviewed and approved for the vacation, relocation, or other alteration of individual lots, and may be approved for a family subdivision or division of a lot or parcel subject to a POD or Site Plan, provided the minor subdivision does not include relocation, alteration, or extension of public streets, utilities, or other improvements. The Director of Planning approves all subdivision plats.

 

Where do I apply for POD, Site Plan or Subdivision review?

Learn More

 

What procedure is required to obtain POD or Site Plan approval?

The POD and Site Plan process is designed to coordinate the numerous reviews and recommendations of all applicable Henrico County, State and Federal agencies. This integrated review process is managed by the Planning Department. The process is an administrative process designed to ensure the technical requirements are met. A Public Hearing is not required, but POD’s and major site plans are available for viewing each month online.

The plans are filed in accordance with the monthly filing deadline calendar. The plans are distributed to all applicable agencies for review and comment. Following the comment deadline, a meeting is held between the applicant and/or representative and the County staff to discuss the proposal in relation to the departmental comments.  Staff reviewers provide detailed comments as well as identify key issues that must be addressed prior to recommending approval of the application. The applicant may resubmit plans to address staff comments. Once the key technical issues are addressed, the Director may approve the POD or Site Plan.

If the request is approved, the applicant revises the plans as necessary to address the remainder of the technical comments in accordance with the approval, and submits the number of sets detailed in the Plans for Signature application to the Permit Center. The Planning staff will coordinate the review of the revised plans, and route the revised plans to Planning, the Department of Public Utilities, and the Department of Public Works for approval signatures, once the plans are finalized.

Once these signatures are affixed, the applicant uses these plans to apply for building permit approval.

BUT, before formally submitting the necessary documents for POD or Site Plan approval, you should contact the Planning Department and review your proposal preliminarily to determine the particular requirements for your project.

For detailed procedures of the POD and Site Plan Review process (effective November 14, 2023 for all new plan applications).

For detailed procedures of the POD and Site Plan Review process (Legacy process for all applications that had an original submission prior to November 14, 2023).

 

What process is required to obtain subdivision plat approval?

There are 3 distinct subdivision approval processes, based upon the project parameters:

Preliminary Plat, Final Plat, and Minor Subdivision

Before formally submitting the necessary documents for subdivision approval, you should contact the Planning Department and review your proposal to determine the particular requirements for your project

Preliminary Plat

A Preliminary Plat approval is required prior to any subdivision of land into more than 50 lots. Approval of a preliminary plat may be requested, at the applicant’s option for any subdivision of land into fewer than 50 lots.

The Preliminary Plat review process is managed by the Planning Department and coordinated with County and certain external agencies. A Public Hearing is not required, although Preliminary Plats are available for viewing each month online. The process is an administrative process designed to ensure the technical requirements are met.

The plans are filed in accordance with the monthly filing deadline calendar. The plans are distributed to all applicable agencies for review and comment. Following the comment deadline, a meeting is held between the applicant and/or representative and the County staff to discuss the proposal in relation to the departmental comments.  Staff reviewers provide detailed comments as well as identify key issues that must be addressed prior to recommending approval of the application. The applicant may resubmit plans to address staff comments. Once the key technical issues are addressed, the Director may approve the Preliminary Plat.

If the Preliminary Plat is approved, the applicant has a period of twelve months in which to apply for Final Plat approval.

 

Final Plat

Approval of a Final Plat by the Director of Planning is required prior to recordation of a subdivision plat in the Circuit Court (except for Minor Subdivisions as discussed below). A final plat may be approved for all, or a portion of, the land approved to be subdivided on an approved Preliminary Plat. A Preliminary Plat approval is optional, but not required for subdivision of land into 50 lots or less.

The Final Plat review process is managed by the Planning Department and coordinated with County and certain external agencies. This administrative process is designed to ensure the technical requirements are met.

There is no deadline for filing Final Subdivision Plats.

The plans are distributed to all applicable agencies for review and comment. Following the comment deadline, a meeting is held between the applicant and/or representative and the County staff to discuss the proposal in relation to the departmental comments.  Staff reviewers provide detailed comments as well as identify key issues that must be addressed prior to recommending approval of the application. The applicant may resubmit plans to address staff comments. Once the key technical issues are addressed, the Director may approve the Final Plat.

If the Final Plat is approved, the applicant may move forward with approval of construction plans. The applicant revises the plans as necessary to address the remainder of the technical comments in accordance with the approval, and submits the plans for construction plan review. The Planning staff will coordinate the review of the revised plans, and route the revised plans to Planning, the Department of Public Utilities, and the Department of Public Works for approval signatures, once the plans are finalized.

If the Final Plat is approved by the Director of Planning, the applicant has a period of one year in which to record the subdivision.

Should the applicant be unable to request final approval or record the subdivision plats within the required time period, a written request for an extension of preliminary or final plat approval may be submitted to the Planning Department for consideration by the Director of Planning.

The applicant may record the plat following construction plan approval. In order to record the subdivision, the applicant must submit plats for technical check and approval signatures. Financial guarantees of the construction of the public improvements in each subdivision must be filed. After the improvements are constructed or the guarantee is accepted by the County, the applicant records the subdivision plats with the Circuit Court Clerk’s Office.

After the subdivision plats are recorded, the developer may submit plans for building permit approval.

Minor Subdivision

A Minor Subdivision procedure is available to approve any property/parcel adjustments which are outside of the scope of the established processes of Preliminary and Final Plats. Approval of a Minor Subdivision does not require submittal and approval of a Preliminary or Final Plat. Instead, a Minor Subdivision application including a survey is submitted for review, and if approved, the survey plat may be recorded.

Minor Subdivisions are not intended to include approval of construction plans; therefore, if public improvements such as utility extensions or road construction are needed, a Final Plat must be applied for instead, unless separate approval of the associated plans are authorized by Department of Public Works and/or Department of Public Utilities. A Minor Subdivision has an abbreviated review procedure.

Minor Subdivisions include any of the following:

Family Subdivision

A Family Subdivision is a single division of a lot or parcel for the purpose of sale or gift to a member of the immediate family of the owner that does not require a new public street. One division is allowed for each family member, and that portion of the original lot which is to be transferred pursuant to the Family Subdivision may not be subsequently transferred, except to a member of the immediate family, for a period of five years.

Lots created under Family Subdivision approval are not required to front on a public road for the 50-foot minimum. However, if the lot lacks the required 50 feet of public road frontage a private drive must be constructed. Therefore, the family subdivisions are broken into two categories for review and approval.

  • If each of the proposed lot(s) meet the required minimum 50 feet public road frontage, the review and approval may follow a Minor Subdivision
  • If any of the proposed lot(s) lack the required minimum 50 feet public road frontage, the Final Plat process is the applicable review and approval process in order to accommodate construction of required facilities.

Division of a lot or parcel of land pursuant to a plan of development

To create a division of a lot or parcel which has a previous POD or Site Plan approval, a minor subdivision application is required, unless a subsequent POD or Site Plan includes the proposed division within the submission for review/approval. The Minor Subdivision is solely for the recordation of the parcel division and may not include other construction or work to be performed.

Vacation, Relocation, Resubdivsion, or Other Alteration of Individual Lots

All lots/parcels of land must undergo a review and approval process by the Department of Planning to ensure proposed adjustments do not create any zoning violations. This process is eligible for all residentially zoned properties, provided no other work is proposed beyond the lot/property line adjustments. This process cannot be utilized to create any additional residential buildable lots.

All Minor Subdivisions must undergo at least one pre-recordation review.  The review and approval process for each type of Minor Subdivision is detailed more fully in the document linked below.

BUT, before formally submitting the necessary documents for POD or Site Plan approval, you should contact the Planning Department and review your proposal preliminarily to determine the particular requirements for your project.

For detailed procedures of the Subdivision Review process (effective November 14, 2023 for all new plan applications).

For detailed procedures of the Subdivision Review process (Legacy process for all applications that had an original submission prior to November 14, 2023).

Contact Us

Planning

Physical Address
4301 East Parham Road
Henrico, VA 23228

Phone
(804) 501-4602

Fax
(804) 501-4379

[email protected]

Mailing Address
P. O. Box 90775
Henrico, VA 23273-0775

Additional Contact Info  

 
Google Translate Icon

Translate