Wilkinson Road Bridge Replacement

Project Status: Underway - Design

Estimated Cost: $4.79 million total
Start Date: Spring 2018
Estimated End Date: Fall 2019

Magisterial District:   Fairfield  


The existing Wilkinson Road bridge that crosses Upham Brook between Wilkinson Estates Drive and Pony Farm Drive is a series of three parallel 10’ wide box culverts that were constructed in 1954.  Scheduled maintenance inspections identified a structural deficiency in 2008 that was immediately repaired.  Since this repair, Henrico County has been planning this project to remove the aging structures and replace it with a new bridge. This project is 100% County funded. 

Estimated Schedule

  • Design is underway
  • Right-of-way acquisition is anticipated to begin – Fall 2016
  • Utility relocation is anticipated to begin – Summer 2017
  • Construction is anticipated to begin – Spring 2018
  • Project completion is anticipated in – Fall 2019

Contact Us

Robert Tieman
(804) 501-5985
tie@henrico.us


Public Works

Henrico Department of Public Works
4301 E. Parham Rd.
Henrico, VA 23228

Phone
(804) 501-4393

DPW@henrico.us

Mailing Address
P. O. Box 90775
Henrico, VA 23273-0775