Greenwood Park

Project Status: In Progress

Estimated Cost: $11 million
Start Date: September 2016
Estimated End Date: February 2018

11217 Greenwood Road
Glen Allen, VA 23059

Magisterial District:   Brookland  


Project Description: This project will provide a tournament quality sports complex known as Greenwood Park Phase I, located on the existing 88-acre site. The construction project will include site-work/grading of the existing front half of the site, internal park access road, Greenwood Road improvements, paved parking areas, sand volleyball courts, a large restroom building, and a tournament quality sports complex which will consist of four lighted multi-purpose organic infill synthetic athletic fields. Supporting development infrastructure is included such as utilities (water and sewer), new power service, and storm water infrastructure. In addition, other activities required to complete the project will be included such as site irrigation, landscaping, sports equipment, fencing, and signage.

Schedule: On-site construction activities began October 2016 and the project is anticipated to be completed by February 2018.

Design Engineer: CHA Consulting Inc.

Construction Contractor: The LandTek Group, Inc.

Architectural & Engineering Firm: CHA Sports was contracted to provide master planning and construction document design services related to the Phase I project.

Progress to Date

September 2017:  All overall site work for the complex is 100% complete.  The sports lighting system foundations, poles (quantity 11), underground electrical conduit and parking lot lights are 100% complete.  Construction work related to the four multipurpose sports fields is 90% completed.  The sports field synthetic turf and shock pad on over 10 acres of synthetic fields has been installed.  The organic infill and sand mixture designed to hold the turf in place and provide for a high-end playing surface is 75% completed. The building metal framing, exterior sheathing, and roofing work is 90% completed.  Building mechanical, electrical, and plumbing rough-in has begun.  Site irrigation and grading adjacent to the fields is now 90% completed. 

February 2017: During February, the contractor will be installing a new sewer line within Greenwood Road from the intersection of Greenwood Road & Braxton Avenue to the new park entrance.  Construction work will occur Monday thru Friday between 9 AM and 3:30 PM per the attached diagram.

October/November 2016: The contractor completed land disturbance activities and erosion control measures required to protect the construction site from rain events.  Three large storm water detention basins have been installed and the tree clearing and grubbing activities of approximately 25 acres was been completed during November and December.  The contractor is proceeding with on-site storm water piping, limited earthwork activities and preparation of the large restroom building pad.  Rain events and poor weather in late December 2016 and January 2017 has delayed site earthwork activities.

September 13, 2016: Onsite construction activities begin

July 12, 2016: Construction contract for the Phase 1 development was approved by the Board of Supervisors

November 24, 2015: The Greenwood Park master plan was adopted by the Board of Supervisors.

November 12, 2015: The park master plan has been completed and presented at a public meeting.

 


Documents



Contact Us

Steve Hart
(804) 501-5117
har03@henrico.us


Recreation and Parks

Phone
(804) 501-7275
Inclement Weather Hotline
(804) 501-5132

Fax
(804) 501-5284

recandparks@henrico.us

Mailing Address
P. O. Box 90775
Henrico, VA 23273-0775

Twitter Facebook Instagram

Category